Journal of Seismology and Earthquake Engineering

Journal of Seismology and Earthquake Engineering

Reconnaissance Report on Bam Earthquake Social and Public Policy Issues

Document Type : Risk Management

Authors
1 Natural Hazards Research and Applications Information Center, University of Colorado and EERI
2 GeoHazards International and EERI
3 Earth Institute, Columbia University and EERI
4 Center for Disaster Risk Management, Virginia Polytechnic Institute and State University and EERI
5 IIEES
Abstract
May, 2004 the "Learning from Earthquakes" program of the Earthquake Engineering Research Institute sent a team of researchers on a reconnaissance mission to Iran and the site of the Bam earthquake (December 26,2003). The purpose of this team was to study social science and policy aspects of the earthquake impact, relief and recovery phases. Interviews were conducted with a wide range of stakeholder groups including victims and those responsible for public and private recovery activities. Observations were collected related to transitional housing, mental health, economic and social recovery and the planning process for permanent reconstruction. Particular attention was paid to innovative programs and policies developed in response to this earthquake disaster.
Keywords

Volume 5, Issue 4 - Serial Number 4
Special Issue on Bam Earthquake
Winter 2004
Pages 209-215

  • Receive Date 15 September 2014
  • Accept Date 26 December 2020
  • Publish Date 01 January 2004